One of our staff picked up the tired 1975 18' Seacraft and gave it a refresh over the winter.
He removed the fuel tank and replaced it with a moeller plastic under deck tank. Removed the console and repaired all the old holes. Replaced the fuel tank compartment deck hatch, redid the transom, and rewired the boat from head to toe. The interior finish was done with Hatteras Off-White awlgrip rolled and tipped and a custom kiwi-grip color for the non-skid. When the engine was re-rigged, new control cables, control box, and batteries were used. Comments are closed.
|
Project Gallery
Candid shots and descriptions of projects going on around the yard. Categories
All
Archives
March 2020
|